Does artificial turf alone qualify for the rebate?
No. The district's FAQ asks, "Is there an incentive for replacing my lawn with artificial turf?" Its answer starts with "Not exactly." It accepts turf in place of mulch, but only if the turf is permeable to air and water. Every other rule still applies, including plant cover and drip irrigation1. A yard that swaps grass for wall-to-wall turf gets $0.
Other hard swaps don't pay either. Concrete where grass used to be earns nothing, and the district subtracts it from the measured area. Trading your lawn for a low-water grass doesn't count. Ungrouted pavers or flagstone that let water and air through can count as mulch, as long as the other rules are met1. That matters if you're planning a paver patio as part of the project.
Check eligibility with the district before you start; pre-approval is required. Removing or killing your grass before approval and the pre-conversion site visit makes the project ineligible21. If an ad promises a turf rebate, check it against the district's own terms before you sign.
What does the district pay right now?
The program agreement sets the amounts. It pays $2 per square foot for qualifying converted areas. Projects completed between June 9, 2026 and June 1, 2027 get a supplemental $1 per square foot on the first 1,000 square feet. Projects in Santa Clara get another $1 per square foot on the first 500 square feet2.
- Treebate: $100 for each qualifying shade tree added to the project2.
- Cap: $100,000 per property, per calendar year2.
- Minimum: 300 square feet of grass. Exemptions can apply when all the grass comes out of one area, like a whole park strip or a front or back yard2.
- Not eligible: projects required to comply with a regulation, code or policy, and areas the district already ruled ineligible2.
- Payment: checks go to the property owner within 30 days after the district has all required documents. A check is void after 90 days2.
The district's program page headline says it pays $3 for each square foot1. The agreement shows how that works: $2, plus the temporary $1 on the first 1,000 square feet2. Every square foot past 1,000 gets $2.
When can turf be part of a project that qualifies?
Turf can be part of a real water-efficient conversion. The converted area needs living plants covering 50% of it at maturity, drip irrigation on its own valves, and at least 2 inches of mulch. Rock, bark, ungrouted pavers and permeable artificial turf all count as that mulch. You also grant a conservation easement that never expires2.
- Plant cover: the district counts each tree as 350 square feet and each shrub, groundcover or perennial as 35 square feet, at mature size1.
- Drip: dedicated valves, a filter, a pressure regulator and emitters rated at 20 gallons per hour or less, all visible for inspection2.
- Leftover grass: grass next to the converted area must be at least 8 feet wide. Sprinklers can't spray or flow into the converted area2.
- Weed barrier: impermeable barriers like plastic are prohibited2.
- Easement: no irrigated lawn, spray irrigation, pools or water features in the converted area, ever. It's recorded with the Washington County Recorder1.
True Turf builds the turf, rock, paver and planter parts of a yard like this. Ask True Turf about the drip work and the plant layout before you apply. See desert landscaping with plants on drip for how the pieces fit.
What does the math look like on a real yard?
Here's one 1,000 square foot lawn done two ways, for a project outside Santa Clara finished by June 1, 2027. Plan B uses the district's own plant-counting guide. The district's site visit and final inspection set the real qualifying area, and payment is based on the area that qualifies at completion12.
| Plan A: turf only | Plan B: plants on drip, rock and some turf | |
|---|---|---|
| What goes in | 1,000 sq ft of turf, no plants | 1 new shade tree, 5 shrubs, drip, rock mulch and permeable turf |
| Plant cover at maturity1 | 0 sq ft | 350 + (5 x 35) = 525 sq ft, just over 50% |
| Base rate2 | $0 | 1,000 x $2 = $2,000 |
| Temporary supplement2 | $0 | 1,000 x $1 = $1,000 |
| Treebate2 | $0 | 1 x $100 = $100 |
| District payment | $0 | $3,100 |
In Santa Clara, Plan B would get $500 more, from the extra $1 on the first 500 square feet2; see Santa Clara's bonus. Unlike concrete, permeable turf used as mulch isn't subtracted from the measured area2. For what each plan costs to build, see what turf costs in St. George.
Get an exact price for your project. True Turf calls you back within 30 minutes during business hours.
Call (435) 660-6207Send the formWhich towns can use which program?
The district program covers properties in St. George, Washington, Hurricane, Santa Clara, Ivins, La Verkin, Toquerville, Virgin and unincorporated Washington County2. Cedar City, Enoch and unincorporated Iron County use the state's program through Utah Water Savers3. Several nearby towns, including Kanab, Leeds and Springdale, weren't on the state's eligible list when we checked4.
| Area | Program | What it pays | Artificial turf alone |
|---|---|---|---|
| St. George, Washington, Hurricane, Ivins, La Verkin, Toquerville, Virgin, unincorporated Washington County | Washington County Water Conservancy District | $2 per sq ft, plus $1 per sq ft on the first 1,000 sq ft for projects finished June 9, 2026 to June 1, 20272 | $0; counts only as mulch1 |
| Santa Clara | Washington County Water Conservancy District | Same, plus $1 per sq ft on the first 500 sq ft2 | $0; counts only as mulch1 |
| Cedar City, Enoch, unincorporated Iron County | Utah Division of Water Resources, through Utah Water Savers3 | $2.00 per sq ft, up to $50,000 per application5 | Excluded5 |
| Kanab, Leeds, Springdale, Rockville, Apple Valley, Hildale, Enterprise, New Harmony, Parowan | Not on the state's eligible list4 | Nothing listed | Not applicable |
| Mesquite, Nevada | Virgin Valley Water District | No lawn conversion rebate listed6 | Not applicable |
Mesquite isn't a Utah program, but people ask. Its water district says it encourages conservation through its rate structure and education, and its conservation page lists no turf or lawn rebate76.
How is the Cedar City and Enoch program different?
It's run by the Utah Division of Water Resources and pays $2.00 per square foot of grass removed and replaced, up to $50,000 per application. It excludes turf in plain words: water-efficient landscaping "does NOT include; artificial turf, a swimming pool, water feature, or concrete"5. Pavers and other permeable materials are allowed if plants cover 50% of the project area5.
- Project size: at least 200 square feet of living, maintained lawn5.
- Plants: waterwise perennials or shrubs must cover 50% at maturity, and trees don't count toward it5.
- Drip: emitters no bigger than 5 gallons per hour, with a filter and a pressure regulator5.
- Mulch: 2 to 4 inches of permeable gravel, rock, bark or similar wherever there aren't pavers or stone5.
- Payment: a check from the State of Utah after the final inspection and a W-9, which Utah Water Savers says takes about 90 days58.
See landscaping in Cedar City and Enoch for local lawn rules and winter weather.
How do you apply without losing eligibility?
Apply first, then wait. A district representative contacts you within 14 business days to set up a pre-conversion site visit. If you start work before approval and that visit, the conversion is ineligible2. Keep the grass alive until then. The district says current Utah law requires living grass for program participation1.
- Apply on the district's site before any demolition2.
- Keep watering. Shutting the water off for up to a month before the visit is OK if grass blades still show. Don't clear the area1.
- After approval, finish the project and request inspection within 12 months2.
- Sign the conservation easement in front of a notary, and turn in all documents within 6 months of finishing12.
- Owner-occupied primary homes without rental income skip the W-9. Second homes, rentals and businesses send one21.
How we checked this
On October 21, 2026, we read the district's program page, FAQ and full program agreement. We quoted the amounts, dates and conditions as written there12. For Iron County we read the Utah Water Savers program details, eligibility list and program page, plus the state's list of qualifying communities5384. For Mesquite we read the Virgin Valley Water District's FAQ and conservation page76. Program terms change. Check eligibility with the district before you start; pre-approval is required.
